Preliminary Site Evaluation

Updated: 3/3/2011 01:41:44 PM

PRELIMINARY SITE EVALUATION (P.S.E.)
(applies to properties served by a private sewage system) 

undefined

P.S.E Flow Chart
P.S.E Application

WHEN: A Preliminary Site Evaluation (P.S.E.) is required prior to the issuance of a zoning and/or building permit on properties served by a private sewage system. A P.S.E. is conducted when the following improvements are proposed: remodeling or a building addition, a change in use, or when an accessory structure is proposed.

WHY: A P.S.E. is required to assure the existing private sewage system is operating properly and that minimum setback distances are maintained from the improvement to the existing sewage system, pursuant to Chapter 145 – Wisconsin State Statutes, DCOMM83 - Wisconsin Administrative Code and Waukesha County Code – Chapter 14, Water and Water Quality, available online and in the office of the Waukesha County Clerk.

WHO: The Department of Parks and Land Use – Environmental Health Division performs the site evaluation. Following the evaluation, a letter recommending approval or denial of the improvement is sent to the owner, local building inspector and Waukesha County Department of Parks and Land Use – Planning and Zoning, if applicable.

HOW: Submit a complete application and fee to the Environmental Health Division.

A COMPLETED APPLICATION SHALL INCLUDE THE FOLLOWING: 

  • Preliminary Site Evaluation Application form
  • Plans or sketch of the proposed improvement
  • Soil Test Report for Category ‘C’ Type of improvements


FEE 

  • See Department of Parks and Land Use – Environmental Health Division Fee Schedule 


TIME: 

  • P.S.E. completed applications are reviewed by Environmental Health Division and normally acted on within ten (10) working days.


NOTE: 

  • Unless requested, P.S.E. Applications are not required for improvements that involve reroofing, painting, wiring, residing, window replacements or replacement of equipment or appliances.
  • A P.S.E. is required for a Zoning Permit and/or a Building Permit.